A backtest gives one sequence of trades. The future will give another one. A Monte Carlo simulation replays your trades in many random orders and variations to show the range of results the same edge could produce.
What it does
The simulation takes the list of trades of your backtest and builds a thousand new histories, for example by shuffling their order or by drawing trades at random with replacement. Each history has its own final profit and its own maximum drawdown.
How to read it
- Probability of profit: the share of histories that end above the starting balance. Close to 100% means the result does not depend on a lucky order.
- Drawdown percentiles: the drawdown that 50%, 95% or 99% of histories stay below. The 95th percentile is a reasonable planning figure.
- Risk of ruin: the share of histories that lose a large part of the account.
Why the backtest drawdown is too optimistic
The drawdown of the backtest is the drawdown of one particular order of trades. If the worst losses had come together, it would have been deeper. Monte Carlo shows how much deeper, and the 95th percentile is often well above the drawdown of the backtest.
Using it to choose your risk
If the 95th percentile drawdown at 1% risk per trade is 18%, and you do not want to live through more than 10%, use about 0.5% risk. For a prop firm challenge, compare it to the maximum loss limit, not to your comfort.
Limits
Monte Carlo assumes future trades look like past trades. It cannot protect you from a market that changes, or from a strategy fitted to noise. Use it after checking that the edge is real, not instead.
FAQ
What does a Monte Carlo simulation tell a trader?
The range of results the same edge could have produced with a different order of trades: the probability of ending in profit and how deep the drawdown could reasonably get.
Which Monte Carlo drawdown should I plan for?
The 95th percentile is a common planning figure: 95% of the simulated histories stay below it.
Can Monte Carlo prove a strategy works?
No. It assumes future trades look like past ones. It measures the risk of a real edge, it cannot tell whether the edge is real.